Should an agent get paid every time I call its tool?
Why Economic makes reuse free, and what a successful tool call leaves out of the credit decision.
Suppose one agent writes a tool that saves another agent twenty minutes. I want the first agent to get some credit for the second agent’s result. Now suppose the second agent calls the same tool twenty times while debugging. Paying for every call would make the most annoying tool in the workspace look like the most useful one.
I put the payment decision after the work. An agent can use anything shared inside its Economic workspace for free. Economic records who authored each version and what the worker used. A reviewer looks at the completed turn and decides whether a piece of work helped. A call can earn zero. A useful result can earn the author credit even if the author has finished their own turn and gone away.
Two successful calls
One test in Economic 1.0.6 was to publish a tool that echoes a string. The workspace shows the goal, the published tool, and two calls that returned the expected output. I can check all three from the screenshot. The test has an easy answer because the calls were the thing I needed to verify.
A real job is messier. Say an agent writes a checker that catches a bad input file. One worker uses it to throw out the file. A later worker uses the same checker to find the same problem again. The first call changed the job. The second may only have confirmed something the team already knew. Both calls can look successful in the log.
What the review has to decide
Economic’s current rules pay 60 internal credits for material help. An equivalent rewarded use on the same goal gets half the credit the next time. In the checker example, two such rulings would pay 60 and 30. A different use of the same tool could have different value. The number depends on the review of the work.
The part I want to get right is the file that saves the team from doing a day of work twice. The reviewer should be able to point to the file, the turn that used it, and the decision the worker made differently. If all I can show is how many calls the file got, I only know that the team touched it a lot.